4/8/2014
The cleaners were in early today taking them a good 6 hours to clean the house inside and out and it has made such a big difference. The A/C and Crimsafe men also quoted us on their products. The A/C will be an Actron ESP Platinum Ultima. The Bamboo flooring will be installed on Friday and the carpet Tuesday next week. I also need to arrange a quote to get the driveway done this week. Very busy times ahead. Some pics from today.
NBN ready to go.
WIR shelving
SMEG microwave.
Under mount sink with routed drainer on the left.
WIP shelving.
Main Bathroom.
Main Bathroom shower.
Looking towards the front door.
Kitchen
Lounge room. Eventually there will be a gas fire built in and TV above it.
Alfresco
Alfresco
Dining Room.
Computer Desk behind the Kitchen.
En-suite
En-suite shower.
Looking out from the Master Bedroom.
And Lake views although this will probably disappear when the home across the road is built.
Balinese Façade.
Plenty of landscaping, fencing and retaining walls to do!