Tuesday, July 8, 2014

2nd Walk-Through

8/7/2014

We had our second walk-through with the SS today. The carpenter was busy with the door jambs and doors which all are now installed. The tiling is planned to start next week after the cabinets and tops are installed. The painters are after that then final electrical work to be completed. The Bamboo flooring and carpets to go in last. He gave a tentative estimation of 7 weeks which is not that long. We don't plan to move in immediately as I want the driveway, ducted A/C, solar panels and shutters completed and we don't need to get out of our house as we own it. That reminds me, I better contact the Real Estate agent to arrange preparation for placing it on the market just in time for Spring. I thought I would take the opportunity to snap some pics while I was with the SS.

Finally a shot with no Tradie cars out the front and Garage doors down.

Kitchen and Study Nook on the left.
Kitchen with WIP & Fridge recess.
Lin door leads to the huge walk-in Pantry.
There will be another Lin door on the entry (Right) to the Home Theatre installed after handover.

Hallway
Toilet
Bench & Above Cabinets in Laundry.
Main Bathroom where the freestanding bath will go.

Doors for the Linen.
Lin door for the Master Bedroom.
Double basins in the en-suite.
En-suite shower
Raised Coffer ceiling from Entry Door.
Solid Door into triple Garage.



2 comments:

  1. Good, we will have some more neighbours soon!! I wish I had a 3 car garage just for the rubbish!

    ReplyDelete
  2. Don't worry Chris, we have plenty of rubbish to fill it.

    ReplyDelete