Saturday, August 23, 2014

Interim Certificate

22.8.2014

I received a list of 'things to do' before an interim certificate will be issued. The one that was of most concern was having steps leading to the front patio. The SS arranged to have some fill from the backyard moved around to the front to avoid installing steps. The only problem, it wasn't enough to satisfy Council. Two day's later the job was done properly which should be satisfactory for Council's needs. Backfill was also placed at the laundry entry and to the alfresco and rear of the third garage.